Architect: Unknown
Address: Centre-Dandenong Road, Moorabbin
Year: 2006
The above image depicts a detail of how the interior cladding is fixed to the concrete panel using a horizontal girts with vertical girts (the horizontal girts are seen exiting the cladding on the left). Note also the gas service pipes running up the wall which will eventually be hidden by the cladding.
The above image depicts a detail of how the interior cladding is fixed to the concrete panel using a horizontal girts with vertical girts (the horizontal girts are seen exiting the cladding on the left). Note also the gas service pipes running up the wall which will eventually be hidden by the cladding.
The above image depicts a detail of the connection between the SHS column and the concrete footing. Note the mastic around the perimeter of the footing hole. The relationship between the base plate fixed to the concrete footing and column can also be seen here.

1 comment:
How is the cladding attached to the girts on the interior wall? Is their some kind of clips or something that we can't see in the photo? Also is the section inside the mastic where the bolt-plate connection is going to be filled with concrete for extra support or is it simply covered by the flooring system?
Post a Comment